DoSkipWorkCenterOnDataLoad
This event allows the customer to prevent (skip) the loading of certain workcenters into the simulation during the load/reload phase. Subordinate or connected elements will then also not be loaded into the simulation.
[IntegrationEvent(/*IncludeSender*/false, /*GlobalVarAccess*/false)]
procedure DoSkipWorkCenterOnDataLoad(pClientGuid: Guid;
var pWorkCenter:Record "Work Center"; var pSkip: Boolean;
var pHandled: Boolean)
|
|
Data type |
Description |
|
Parameter: pClientGuid |
|
|
|
var pWorkCenter |
Record |
Determines which record will be skipped. |
|
var pSkip |
Boolean |
Determines whether records will be skipped or not. |
|
var pHandled |
Boolean |
If it returns true, the event will be skipped |