-
Visual Advanced Production Scheduler (VAPS) for Dynamics 365 Business Central
- Support
- Release and version status
- Installing the VAPS
- Look and feel of the visual schedule
- The view color modes
- Setting up the VAPS
- Integrating with Microsoft Dynamics 365 Business Central
- Finite Capacity Scheduling Instruments
- Simulations
- Day-to-day use cases
- Coding tips (for partners)
- API Events VAPS
-
Visual Production Scheduler (VPS) for Dynamics 365 Business Central
-
Visual Jobs Scheduler (VJS) for Dynamics 365 Business Central
-
Visual Production Scheduler (VPS) for Dynamics NAV
-
Visual Job Scheduler (VJS) for Dynamics NAV
OnAfterSaveProdOrderRoutingLine
This event occurs after saving a production order routing line.
[IntegrationEvent(/*IncludeSender*/false, /*GlobalVarAccess*/false)]
procedure OnAfterSaveProdOrderRoutingLine(pClientGuid: Guid;
var pProdOrderRoutingLineRecordOriginalTemp: Record “Prod. Order Routing Line” temporary;
var pProdOrderRoutingLineRecordAfterTemp: Record “Prod. Order Routing Line” temporary)
|
Data type |
Description |
Parameter: |
|
|
pClientGuid |
Guid |
This value is used for the global identification of VPS Control-AddIn on a page. |
var pProdOrderRoutingLineRecordOriginalTemp |
Record |
The original production order routing line. |
var pProdOrderRoutingLineRecordAfterTemp |
Record |
The after save production order routing line. |
//do anything in bc here what has to be done after VPS modified porl is saved to BC;