-
Visual Advanced Production Scheduler (VAPS) for Dynamics 365 Business Central
- Support
- Release and version status
- Installing the VAPS
- Look and feel of the visual schedule
- The view color modes
- Setting up the VAPS
- Integrating with Microsoft Dynamics 365 Business Central
- Finite Capacity Scheduling Instruments
- Simulations
- Day-to-day use cases
- Coding tips (for partners)
- API Events VAPS
-
Visual Production Scheduler (VPS) for Dynamics 365 Business Central
-
Visual Jobs Scheduler (VJS) for Dynamics 365 Business Central
-
Visual Production Scheduler (VPS) for Dynamics NAV
-
Visual Job Scheduler (VJS) for Dynamics NAV
OnAfterProdOrderRoutingLineSelectionChange
This event occurs when one or more production order routing lines get selected.
Please note: Multiselect is not officially released but can be unlocked by knowledgeable customers.
[IntegrationEvent(/*IncludeSender*/false, /*GlobalVarAccess*/false)]
procedure OnAfterProdOrderRoutingLineSelectionChange(pClientGuid: Guid;
pProdOrderRoutingLinePositions: List of [Text]; var pHandled: Boolean)
|
Data type |
Description |
Parameter: |
|
|
pClientGuid |
Guid |
This value is used for the global identification of VPS Control-AddIn on a page. |
pProdOrderRoutingLinePositions |
List of [Text] |
List of selected production order routing lines. By default, there is one production order routing line. In the future, in case of multi-selection, several Production Order Routing Lines will be selected |
var pHandled |
Boolean |
If it returns true, the event will be skipped |